LGB 51750 PDF


LGB # ACCESSORY CONTROL BOX–Momentary for Operating Accessories. Use this box to control up to four EPL switches, signals, uncouplers or. LGB – Control from Gaugemaster. Hello All I recently acquired a LGB to power my electric switch machines. The unit came with directions but what I cannot decipher.

Author: Dirg Zuran
Country: Jamaica
Language: English (Spanish)
Genre: Spiritual
Published (Last): 27 September 2005
Pages: 62
PDF File Size: 14.7 Mb
ePub File Size: 14.91 Mb
ISBN: 963-2-51600-879-7
Downloads: 13588
Price: Free* [*Free Regsitration Required]
Uploader: Vule

The switch box’s Original New peel and stick graphic sheet is included.

On the switch box there is 2 male connectors and on the other side 2 female. These are marked with a wiggly line and numbers 3 and 4 and also 17 and 18 on the screw terminal line. Do you have the user manual? I figured that there would be something inside to handle the 20 volts but just wanted to make sure. The green power indicator lamp lights when power is connected to the BB code is On. Posting Quick Reply – Please Wait. The 3 and 4 are colour coded black and white just like the connectors on the transformer so I will add wires to that to power the My electric point throwers are the newer 2 wired ones so they were easy to hook up.

User Name Remember Me?

Remove Advertisements Sponsored Links. Works with all LGB signal and switch motor types 4 independent switches for bi-directional motor control Pilot Light on front panel Weather-resistant construction for indoor and outdoor use German Made Thick UV stable llgb for structural support Operates on 18 volt AC power Mfg: Germany by LGB Components: Shourt Line by Soft Works Ltd. I believe you have confirmed what I thought KRS.

  FUNDAMENTALS OF SEMICONDUCTOR FABRICATION BY S.M.SZE PDF

Output lhb strip for power in and outputs for each of the 4 switches. Since I am only using the one unit should I make up plugs to connect onto the male ends and will that power the unit? Powering a LGB ? I do have the directions that came with the switch box but they don’t really tell where to pick up the juice to power the I understand which connections to make for my paticular switch machines but not the transformer.

Problem with LGB switch, machine, and control box. Register Now In order to be able to post messages on the myLargescale. Thanks Dan and KRS for replying. Please enter your desired user name, your email address and other required details in the form below.

Thanks for the info and handy link.

Control Box

If adding a second unit, it just attaches to the first unit with the banana type connectors at the end. Just hook up the colors for the EPL drives.

Call me if you need more info. Password Please enter a password for your user account. In order to be able to post messages on the myLargescale.

  BIBLIA EKUMENICZNA PDF

Quote message in reply? Note that passwords are case-sensitive. The time now is That doesn’t make sense.

Power can be connected to the terminals numbered “3” and “4” on the screw terminal strip Fig. It is all hooked up now and working well.

Shourt Line – Soft Works Ltd. – Products – G Scale LGB Momentary Switch Control Box NEW EBAY

This unit was designed for the older 3 wire epl drives as well as the newer 2 wire drives. For questions on this item or details on our professional repair and conversion services Call 3 Should the switch machine be connected to 20 volts? So does the If not you can download it from the Large Scale database: The other choice and I think this is the correct one is to put power to the last 2 screw connectors on the unit.